Case Study: Datum RMS Office Buildout

Location: Davie, FL

Client: Datum RMS

Interior Designer: Jewel Toned Interiors

Architect: Building Ingenuity Architecture & Design

Engineering: Pear Engineering

Project Duration: July 2024 – December 2024

Project Size: 7,257 SF

Overview

In 2024, our team was selected to manage and execute a comprehensive office remodel for Datum RMS. The project involved a complete interior transformation of a 7,257-square-foot space located in Davie, FL. In collaboration with Jewel Toned Interiors and under architectural guidance from Building Ingenuity, we successfully delivered a modern, functional, and aesthetically aligned workspace that supports the client’s vision and operational needs.

Scope Of Work

The project encompassed the buildout of multiple functional zones, including:

  • Two private offices
  • One conference room
  • Two cubicle workstations
  • A full kitchen and breakroom area
  • Two fully remodeled restrooms
  • Air-conditioned warehouse
  • Office lobby entrance

The construction process followed detailed design, architectural and engineering plans, including:

  • Interior Design:  Jewel Toned Interiors
  • Architectural Plans:  Building Ingenuity Project
  • MEP Plans:   Pear Engineering

Key Highlights

  • Demolition & Site Prep:
    Mobilized crews and equipment to begin demolition, including the removal of drywall partitions, existing ceiling systems, flooring, interior lighting, interior electric, and existing HVAC duct work.
  • Interior Buildout:
    Installed new drywall partitions for offices, fire rated demising wall between office and new warehouse, doors, ACT ceiling systems, LVT and carpet tile flooring, and wall base. Notable design features included an aluminum-framed glass wall between the breakroom and conference room, glass doors, and aluminum diamond plate in the entrance foyer.
  • MEP Upgrades:
    Installed new sanitary sewer lines, water lines, mop sink, and high/low water fountain with corresponding concrete patch-back and termite treatment. Electrical work included new outlets, lighting, and conduit runs for future signage and data cabling. HVAC ducts were modified to connect with existing systems and through the new demising fire wall to include installation of fire dampers.
  • Kitchen & Utility Areas:
    The breakroom was built out with new a new sink and faucet, kitchenette cabinets, Quartz countertop with Quartz decorative backsplash, a large kitchen island and new appliances.
  • Finishing Touches:
    Included painting all walls, specialty painting of aluminum diamond plate, window mullion repairs, finish trim work throughout the space, and a full final clean to turn over the space in pristine condition.

Challenges & Solutions

  • Occupied Building Constraints:
    Careful planning and communication were essential to minimize disruptions to neighboring tenants throughout construction.
  • Complex Mechanical Coordination:
    Precise coordination was required for HVAC, plumbing, and fire sprinkler/life safety adjustments within the existing building systems.

Outcome

The newly remodeled Datum RMS office now offers a sleek, modern workspace that reflects the brand’s professional identity and supports productivity. With upgraded systems, enhanced comfort, and creative interior design, this project stands as a model for efficient office buildouts in South Florida.

Testimonial

"The team executed our vision with incredible attention to detail and professionalism. Our new space is not only beautiful but also perfectly suited to our workflow. We couldn’t be happier with the M.A. Construction Group team’s support and responsiveness, and the final result."
— Brent Allsop, Datum RMS